Estimates

What an estimate is made of, and what it is not

A good estimate is a document, not a number. It says what we looked at, what we will do, what we won't and what could change the price.

We write every one after a visit to the house. We don't give a price over the phone.

White gabled rooflines with dark dormer windows and gray shingle roofs on a row of houses

What moves the price

Twelve things that change an estimate

  • Roof size

    Measured in squares, one square being 100 square feet.

  • Pitch and shape

    Steep roofs, valleys and dormers take longer and cost more to flash.

  • Layers to remove

    A second or third layer of old roofing adds tear-off and hauling.

  • Deck condition

    Found after tear-off, so the estimate gives an allowance and a price per sheet.

  • Ventilation and eaves

    Intake and exhaust, plus an ice-and-water barrier where winters call for one.

  • Flashing

    Chimneys, skylights, walls and every vent.

  • Siding material and wall area

    Measured wall by wall, minus the openings.

  • Window count, size and style

    Each opening counted and measured on site.

  • Gutter run and downspouts

    Length, size and where the water goes.

  • Access

    Ladders or scaffold, steep lots and tight side yards.

  • Permits

    Where the town asks for one, the estimate says who pulls it.

  • Season and schedule

    Doing parts together shares the setup. It does not promise a discount.

What the estimate includes

In writing, for every part

  • Included

    What the estimate covers for each part you chose.

    • Tear-off, hauling and disposal

    • Deck inspection with a price per sheet

    • Underlayment, drip edge, starter and flashing

    • Shingles, ridge and vents

    • Siding, windows and gutters, if chosen

    • Cleanup, payment schedule and workmanship page

  • Priced as extras

    What could change after we open the roof or the wall. Each is a signed change sheet.

    • Decking beyond the allowance

    • Rafter or framing repair

    • Fascia and soffit rot

    • Chimney masonry

    • Extra layers of roofing

    • Code upgrades an inspector finds

The visit

What happens when we come to the house

The visit takes about as long as it takes to look carefully. We ask you to be there for the start and the end.

  1. 01

    Step 1: Booking

    Tamar sets a day and asks what is leaking and what you want done.

  2. 02

    Step 2: The walk around the house

    Roof edge, gutters, fascia, siding and every window, from the ground.

  3. 03

    Step 3: The roof

    On the roof tied off, or from a drone when the roof is steep or wet.

  4. 04

    Step 4: The attic

    Deck underside, insulation and ventilation, if we can get in.

  5. 05

    Step 5: Measuring

    Roof, walls, openings and gutter runs, written down as we go.

  6. 06

    Step 6: Photos

    Shown to you on the spot, with what we would repair and what we would replace.

  7. 07

    Step 7: The written estimate

    Options for each part, with a total for each and for all together.

  8. 08

    Step 8: Storm paperwork

    For wind or hail, inspection photos and an itemized estimate, nothing more.

  9. 09

    Step 9: The follow-up

    One call to see whether you have questions. No clock on the decision.

Ask for a written estimate

One visit, one document, with a total for each part and for all of it.